Finally, the shortest pin removes the bus stall and allows the chassis to continue operation. This mode of operation acts identically to dcef, except with 2x20gb connections to the switch fabric. The line cards provide port connectivity and service modules to allow for devices such as firewalls to be integrated within the switch. Please improve this by adding secondary or tertiary sources. The reason 9 slots are used for the calculation instead of 8 for the cef is that it no longer needs to waste a slot with the switch fabric module. This article relies too much on references to primary sources.
Uploader: | Zulukora |
Date Added: | 12 June 2013 |
File Size: | 50.47 Mb |
Operating Systems: | Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X |
Downloads: | 6525 |
Price: | Free* [*Free Regsitration Required] |
In systems that are equipped with two power supplies, if one power supply fails and the other power supply cannot fully power all of the installed modules, system power management will shut down devices in the following order:.
This is ccisco the default and recommended way to configure power supplies. This article provides insufficient context for those unfamiliar with the subject.

However, if any part of this operation is skipped, errors will occur resulting in a stalled bus and ultimately a chassis reload. If a power supply above this is inserted, it will deliver at full power up to this limitation i.
Cisco 6506 E Ios Upgrade
The original chassis permits up to W and uses rear-inserted power supplies different from the others in the series. This mode is the default shipping mode for Cisco products and enjoys support of all new features and line cards.
The supervisor has connections to the switching fabric and classic bus, as well as bootflash for the Cisco IOS software. However, before attempting this, it is important to understand the process of OIR and how it may still require a reload. The following goes through io various chassis and their supported power supplies and loads.
The original chassis can support up to a maximum of W 90A 42V of power, because of backplane limitations. The latest generation supervisor is the Supervisor 2T. These may be run in one of two modes: By using this site, you agree to the Terms of Use and Privacy Policy. These line cards have 2x8gb connections to the switch fabric and no classic ips connection. From Wikipedia, the free encyclopedia.
Please improve this by adding secondary or tertiary sources.
Catalyst 6500
This eliminates the need for any connection to the classic bus or requirement to use the shared resource of the supervisor. This mode of operation acts identically to cef, except with 2x20gb connections to the switch fabric and there is no need for a switch fabric module this is now integrated into the supervisor. The '' is derived from a chassis using 2x20gb ports on 9 slots of a chassis. Articles lacking reliable references from December All articles lacking reliable references Wikipedia articles needing context from February All Wikipedia articles needing context Wikipedia introduction cleanup from February All pages needing cleanup Articles with multiple maintenance issues.
This mode of operation acts identically to dcef, except with 2x20gb connections to the switch fabric.
Catalyst - Wikipedia
However, to obtain this, it must be run in combined mode. The reason 9 slots are used for the calculation instead of 8 for the cef is that it no longer needs to waste a slot with the switch fabric module. To prevent bus errors, the chassis has three pins in each slot which correspond with the line card.
The number is doubled because of the switch fabric being 'full duplex'. This chassis can support a maximum of W A 42V. The advantage of this is that one may perform an in-service upgrade.
This allows for greater utilisation of the power supplies and potentially increased PoE densities. Please help improve the article by providing more context for the reader. Therefore, it is suggested that it be run in redundant mode to obtain a maximum of W A 42V. With the introduction of the E and E series chassis, the maximum power supported has been increased to in excess of W A 42V. A chassis can have 3, 4, 6, 9 or 13 slots each Catalyst model, or65506 with the option of one or two modular power supplies.
As there was enough to power the chassis ahead of time, there is no interruption to service in this configuration. This chassis permits up to W A 42V of power and, like the ciisco, uses rear-inserted power supplies.
The MSFC runs all software processes, such as routing protocols.
Those line cards for whom the data is not required terminate processing.
Комментарии
Отправить комментарий